The Application FMEA method in order to improve work system inAdvanced Engineering Division (AED): a case study of PT. ABC. Tangerang, Indonesia.

Abstract
Sheet metal manufacturing is the an area of specialization PT. ABC. The company operates based on consumer demand. Wall Mounting Type (WM) is one type of customer ordered. In order to achieve the company's quality objectives needed time standard of design/drawing. However, in the process encountered several constraints occasionally, such as: the process of drawing/design is complicated and required accuracy. The problem arises due to the target of fulfilment and affordability of drawing/design is unsuitable. Consequently, this led to a delay in the drawing/design. This study uses an application of the Fishbone diagrams and Failure Mode and Effect Analysis (FMEA). Data collection was performed by direct measurement of the time drawing/design and interviews on Advanced Engineering Division (AED). The study shows several information such as: the improvements were made through the creation of Autolisp programs, modify the layout of the room and establish monitoring job. The study also showed that there was a difference in the standard time measurement results before and after the use of application Autoslip programs. The application Autoslip programs proved the working process of the drafter of 75 minutes and 35 seconds to 35 minutes and 07 seconds. Thus, the drawing/design process declined approximately 10 minutes and 33 seconds. Target achieved after the company's implementing schemes to change the layout of the room and create monitoring job.

Keywords: FMEA, drawing/design, wall mounting, Autolisp

Link:
https://drive.google.com/a/univpancasila.ac.id/file/d/0B1yrndt6P-pYTEZnODdWTlJmdFU/view?usp=sharing

No comments:

Post a Comment

Sertifikasi Ekolabel Pada Industri Kertas

Terdapat beberapa kriteria yang harus dilakukan oleh sebuah industri apabila ingin mendapatkan sertifikasi ekolabel, hal ini termasuk dalam ...